top of page

POLINTEK TUNNEL & BRIDGE GROUTING  is provided for injecting polymer into the concrete construction and the soil behind the construction to stop the water penetration or to elevate the bridge level.

This polymer material designed to well react and adhesive between concrete and soil and connected them as well as one block form.

 

This injection is pointed into the hole chamber and capillary inside the soil and also penetrate the concrete structure. 

DESCRIPTION

BENEFIT

  1. Fast cure in hours.

  2. Best adhesive to all kind of construction materials.

  3. Water resistance and no water absorption.

  4. High mechanical strength.

  5. Vibration absorption.

  6. More flexible than concrete.

  7. More durable than concrete.

  8. Life time more than 50 years.

  9. Anti corrosion and erosion.

GROUTING EQUIPMENT

Epoxy Pump :

Use for injecting capillary and chamber hole.

Hand Pump:

Use for injecting lining grouting.

FLOW PROCESS

TUNNEL & BRIDGE GROUTING

INTEGRATED
INDUSTRIAL
SOLUTION
OUR PRODUCT

POLINTEK Synthetic Sleeper

POLINTEK Railway Parts

POLINTEK Crossing System

POLINTEK Peek

POLINTEK Metal Repair

POLINTEK Concrete Repair

POLINTEK Lining & Protection System

POLINTEK Primary Coating

POLINTEK Top Coating

  • LinkedIn Social Icon
  • Facebook Social Icon
  • YouTube Social  Icon

@2017 Mockup by Desiana

CALL US

021 – 53164777 / +65 81492599

EMAIL US
OPENING HOURS

Mon - Fri: 8am - 5pm

OUR SERVICE

Mapping Survey Application

Conventional Non Destructive Test (NDT)

Advanced Non Destructive Test (ANDT)

Waste Water Treatment

Nitrogen Plant

CONTACT US

INDONESIA

Central Business District Bidex Blok C No. 15

Jl. Pahlawan Seribu BSD City Serpong

Tangerang Selatan, Banten
Phone : 021 – 53164777
Fax : 021 – 53164528

SINGAPORE

Peninsula Plaza
111 North Bridge Road
#04-45B SINGAPORE 179 098
Phone : +65 81492599

bottom of page